Install between a pressure gauge and the process and isolate the process from the gauge to perform a calibration of the gauge. After completing the calibration open the valve and place the gauge on-line, all without blowing down the system.
* Use whenever there is a gauge that needs frequent calibration or verification
Reviews
There are no reviews yet.